Skip to main content
Version: EvoII

Relocating

Consider

It is recommended to have at least two people available to lift the EVO II chassis to prevent accidental drops or damage.

  • Shut down the system through the operating system.
  • Disconnect the power supply cables from the power supply units.
  • Disconnect all external cables, including SDI I/O connections, network cables, and any peripherals attached to the front or back of the EVO II chassis.
  • Ensure that the hot-swappable PSU modules are locked in place.
  • Detach the rails from the rack using the rail release mechanisms.
  • Use proper lifting techniques to avoid injury or damage to the system.